CITY WATT, Office Building
Location
Courbevoie
Clients
La Française Pierre (sketch phase at APD)
Sogeprom (from APD)
Team
Ateliers 2/3/4/ (architectur + design interior + landscape) - Kern (studies coordinator) - Gvi (economist) - Arcora (facade engineering) - Scyna4 (structural engineering) - Gesys (fluids engineering) - Etamine (sustainable development) - Peutz (acoustician) - CCI (elevator engineering) - Interface (kitchen engineering) - Socotec (control office)
Nature of the project
Tertiary, Restructuring, Interior design
Program
Rehabilitation of a office building with two ERP on the ground floor
Status
Under construction
Area
12 000 m² including 860 m² ERP
Calendar
Completion 2021
Cost
32 M€ HT
HQE
HQE BÂTIMENT DURABLE 2016 NIVEAU EXCELLENT
BREEAM NEW CONSTRUCTION 2016 NIVEAU EXCELLENT
WELL CORE & SHELL NIVEAU GOLD
WIRED SCORE NIVEAU GOLD
BIODIVERCITY
LABEL EFFINERGIE RÉNOVATION
Credits
©Ateliers 2/3/4/